Deprecated: mysql_connect(): The mysql extension is deprecated and will be removed in the future: use mysqli or PDO instead in /home2/eramtec/public_html/en/connectDb.php on line 3
Erection of electrical, control and instruments of development of Ardabil cement
Total cable length: 40 KM Total cable tray length: 2 KM 1250 kVA transformers: 2 Nos. Total MV and LV cubicles: 16 Nos. Instrumentation: 50 Nos. Control system I/Os: 1500 Nos. PLC and I/O cabinets: 5 Nos. PLC type: ABB Contract time: 4 months